1. In 2 Print Case Study

In 2 Print Case Study

In order to keep up with increased demand from their customers In 2 Print required more floor space within their busy factory. A mezzanine floor was installed to accommodate the new machinery which needed to be up and running as quickly as possible so business could resume as normal.

During the design stage we had to take into account the required light levels and the start up current of machinery to make sure the electrical system was suitable for it’s intended purpose.

The electrical services which we provided were:

  • Electrical Distribution
  • Lighting design and installation
  • General Power
  • 3 Phase power to machinery
  • Emergency Lighting
  • Data Installation
Amped Up have undertaken many projects for us over the years including our recent factory refit and they always do a quality job while working around our workforce and completing on time and on budget. Simon Dunbar, Operations Director, In 2 Print